Full effect of high softness paint
Classification:
Product Introduction
Product Details
Product Introduction:
Josme Full effect of high softness paint is a two-component cement-based waterproof coating. Powder and liquid mixture, the chemical reaction, the formation of a layer of rigid and flexible elastic waterproof membrane, the membrane has good adhesion to concrete, can form a close and firm combination, to prevent water penetration, can effectively resist the slight vibration of the building and various causes of small cracks.
Packing specification:
18KG color: gray, blue
Performance characteristics:
l Rigid and soft, good flexibility, high strength.
l Excellent waterproof effect, elongation at break> 30%
L can be directly constructed in wet base.
l Convenient tiling, saving labor and time.
l Water-based environmental protection, non-toxic, harmless, non-polluting.
Scope of application:
Indoor and outdoor building walls, floors, kitchen and bathroom, bathroom, basement, garage, pool, swimming pool, fish pond, sewage treatment pool.
Reference Dosage:
L theoretical dosage (coating thickness 1.0mm):1.8~2.0kg/ ㎡ (actual dosage depends on the actual situation of the substrate and the required thickness).
L liquid powder ratio: 1:2.5
Construction process:
L base should be flat, solid, no open water, no floating ash, no sand, no cracks, no oil and loose animals and other defects.
l For the slotted parts of the pipeline and the cracks in the holes, it is recommended to use Jesse Myers to plug the leakage.
L before waterproof construction, the base layer shall be treated with jietumei reinforcement agent or fully wetted with clear water to a saturated state, but there shall be no accumulated (bright) water.
l Pour the liquid into a clean mixing container, and then slowly add the powder while stirring according to the proportion.
l Use an electric stirrer to fully stir until it is a uniform mucilage without powder. After standing for 3 to 5 minutes, stir again and use it up within the available time.
L large area construction should adopt the "cross" construction method, waterproof coating should be brushed two to three times, each time the coating dry rear can carry out the next process, the time interval of 1~3 hours (with hand touch non sticky hand shall prevail), low temperature or humid environment conditions should be appropriate to extend the drying time. Wall waterproof layer coating thickness should be 1.2mm, the ground waterproof layer coating thickness should be 1.5mm.
l After the construction is completed, immediately clean all tools and equipment with water, and clean the solidified slurry with mechanical methods.
Key words:
Full effect of high softness paint
Related Downloads
Message
Copyright ©JOSME Building Materials Technology Co., Ltd.
Business License Powered by www.300.cn
Supports IPV6 SEO