Product Service
Repair thelear filler
+
  • Repair thelear filler

Repair thelear filler


Classification:

Product Introduction

Josme repair thelear filler has a wide range of uses and is easy to use. It can be used by adding water to reconcile. The product has the characteristics of plugging with water and stopping water quickly. It can be used on the back surface and can be applied to drinking water projects.

Product Details


Product Introduction:

Josme repair thelear filler has a wide range of uses and is easy to use. It can be used by adding water to reconcile. The product has the characteristics of plugging with water and stopping water quickly. It can be used on the back surface and can be applied to drinking water projects.

Packing specification:

4 KG/bag (gray)

Performance characteristics:

L early strong, fast dry.

L strong adhesion, facing the back water surface can be construction.

L combined with the base into a whole, aging resistance, good water resistance.

Scope of application:

It is suitable for moisture-proof, anti-seepage and plugging of various underground buildings or structures, cable channels, pools, kitchens and bathrooms, civil air defense cave libraries, subways, tunnels and other projects; it is also suitable for underground pipe corridors, tap water pipelines, dam embankments, Emergency repair of equipment foundation.

Construction process:

L base surface treatment: chisel off the loose objects in the leakage point and seam, clean off the remaining mud and sand, and at the same time, fully wet the base layer but no open water.

L during construction, first pour the weighed water into a clean mixing bucket, then pour the plugging king into and stir quickly. the product has a fast condensation speed and should not be stirred too much at one time. it is recommended to stir in several times. the mixed plugging king should be used quickly;

L when plugging and repairing, pipe root and yin angle arc wiping construction, mix quickly and evenly according to the powder-water ratio of 1:0.24~0.27, and use it. adding more water will prolong the setting time;

For large-area seepage pit, the dry powder of the product can be directly put into the pit, compacted and polished, and watered for curing.

L for serious water seepage cracks, the upper seam should be blocked first, then the lower seam should be blocked, and finally the drainage hole should be blocked.

L have special requirements of the surface, such as subway platforms, reservoirs, tunnels and other seepage cracks, can add steel wire (plate) mesh nail anchor, increase the plugging effect.

Key words:

Repair thelear filler

Related Downloads


Message

JOSME Building Materials Technology Co., Ltd.

Home    |   About Us    |   Products    |   Case    |    Join Us    |   News   |   Contact Us


Address: 169 Bayi West Road, High-tech Industrial Development Zone, Shangqiu City, Henan Province

Telephone:+86-400-6070-217

 

Copyright ©JOSME Building Materials Technology Co., Ltd.  Business License

Powered by www.300.cn  Supports IPV6   SEO

WeChat

WeChat

Copyright ©JOSME Building Materials Technology Co., Ltd.

Business License  Powered by www.300.cn

Supports IPV6   SEO

Two-dimensional code

Sweep the code and enter the beautiful sewing assistant to get more beautiful sewing colors.